What would this machine need to earn?
Estimate the sales and operator time needed to cover your setup. The starting numbers are an illustrative example, not a machine quote or a forecast.
Your estimate
- Total one-time setup
- —
- Cost per sold item, including time
- —
- Contribution per sold item
- —
- Time-based capacity / month
- —
- Monthly sales for your recovery target
- —
A scenario based on your inputs. It does not establish buyer demand, machine throughput or a guaranteed return. Surplus is after the operator-time allowance, before taxes and financing.
What if sales change?
Each scenario uses the same price, costs and time. Sales are capped by your available production hours. Capacity is an estimate, not a tested machine specification.
| Sales scenario | Demand / month | Sales after time cap | Production hours | Monthly surplus | Recovery (months) |
|---|
Turn the plan into a supplier request.
Copy this draft and add your exact material, artwork and finish. Ask vendors to demonstrate a complete batch before using their cycle time in your estimate.
Check which machine class fits your materialHow the calculation works
- Accepted yield = 1 − rejection rate.
- Cost per sold item = (cost per attempt + operator minutes × hourly time value ÷ 60) ÷ accepted yield + cost per sale + percentage sales fees.
- Contribution = selling price − cost per sold item.
- Monthly operating break-even = fixed monthly costs ÷ positive contribution, rounded up to a whole item.
- Monthly surplus = capped sales × contribution − fixed monthly costs.
- Simple recovery = upfront setup ÷ positive monthly surplus. If surplus is zero or negative, there is no positive recovery period.
- Target sales = (monthly fixed costs + upfront setup ÷ target months) ÷ positive contribution, rounded up.
The basic break-even formula follows the U.S. Small Business Administration’s break-even explanation. The rejection, time allowance, capacity and recovery extensions are MakerSpec Lab’s stated planning assumptions.
What to check outside this model
This is a one-product model with constant price, cost, yield and time. It assumes every produced accepted item is sold within the month. It excludes sales tax, income tax, financing, depreciation, working capital, inventory timing, ramp-up and equipment resale value. Add every applicable operating expense to the relevant field; use a separate cash-flow model for financing. It does not prove that the sales or sample result can be achieved.
Rejected attempts consume a full share of material and operator time; per-sale costs and sales fees apply only to sold items. Production hours include the time you allocate here. Measure machine availability and other bottlenecks separately. A zero time value means your labor is unpriced in the estimate.
Next: review the material buying guides or the acrylic machine specification comparison.
Estimate text
Select and copy this text if a file download is unavailable. Inputs stay in this tab.